QBCC
Licensed builder
Insured
Public liability cover
10+ years
Pouring in the region
One crew
Earthworks to finish
What we pour
From the house slab to the front path.
House slabs
Raft and waffle pod slabs poured to your engineer's design.
Driveways
Driveways and council crossovers, reinforced for daily use.
Pool surrounds
Exposed aggregate and broom finishes that stay grippy when wet.
Paths and surrounds
House surrounds that fall away from the walls and keep water out.
Earthworks
We do the dirt work too.
Most concrete problems start underneath. We run our own track loader, so site cuts, levelling and base prep are done by the same crew that pours.
That means one quote, one schedule, and no waiting around for a second contractor before the formwork goes in.
How a job runs
Four steps, no surprises.
01
Site visit and quote
We come out, measure up and talk through levels and drainage. You get a fixed written quote.
02
Prep and formwork
Excavation, road base, compaction, formwork and steel. This is where a good slab is made.
03
Pour and finish
We book the concrete and pump, pour early while it's cool, and finish to the surface you chose.
04
Cut, clean, cure
Control joints cut, forms stripped, site cleaned. We tell you when it's safe to walk and drive on.
For builders
On site at first light, pour done by lunch.
We pour waffle pod and raft slabs to engineer's specs for residential and commercial builders. We book our own pump and concrete and turn up on the day we said we would.
Set-out checked against plans before steel goes down
Ready for your engineer's inspection on time
Clean site handed back for the frame crew
Got a slab, driveway or path in mind?
Send us the address and a rough size. We'll come out, measure up and give you a fixed written quote.
